JOB & DATA Search

Here,Find what you want:

Sunday, December 8, 2013

Horizontal drilling methods: Reason & methods

The choice of drilling method depends upon:
-Cost,
-Well spacing and
-Mechanical conditions of a vertical well bore
-In addition, reservoir consideration.



BUILD RATES
-Ultra-short Radius
-Short Radius
-Medium Radius
-Long Radius

ULTRA-SHORT RADIUS
-45 to 90 degrees per foot
-Special equipment
-Horizontal lengths of 100’ to 200’
-Used in unconsolidated, heavy oil sands and soft formation.
-Impossible to log the open hole section.

-An ultra-short radius drain hole is drilled using endless 1¼ inch tubing.
-Uses a jet under high pressure to cut the formation and advance the endless tubing.
- twenty-four laterals can be drilled at the same horizon.

SHORT RADIUS
-1.5 to 3 degrees per foot.
-Needs special equipment
-Mechanical and motor systems are available.
-Typically used in sidetracking existing wells to bypass water producing or troublesome.
-Bending stress and fatigue can be a problem
-200’ to 1000’ horizontal section
-The horizontal section can be cased with a slotted liner or left open hole.
-Open hole logging capabilities are limited for the horizontal section.

MEDIUM RADIUS
- The first medium radius wells were drilled in 1985
-6 to 35 degrees per 100’ build rates
-Uses conventional equipment
-Horizontal section lengths have been drilled over 7000’ but typically 2000’ to 4000’
LONG RADIUS
-2 to 6 degrees per 100’ build rates
-Uses conventional equipment
-Horizontal section lengths have been drilled over 10,000’ but typically 3000’ to 5000’
-No problem with bending stress, fatigue or completion equipment
-Build section is steerable, which means the motor can be rotated in the build section
-Offshore uses long radius almost exclusively since longer departures are required before the well gets to be horizontal
-Wells are more easily logged.
Read More Here

Sunday, December 1, 2013

Pipeline Risk Management Manual: Ideas, Techniques, and Resources

Here's the ideal tool if you're looking for a flexible, straightforward analysis system for your everyday design and operations decisions. This new third edition includes sections on stations, geographical information systems, "absolute" versus "relative" risks, and the latest regulatory developments. From design to day-to-day operations and maintenance, this unique volume covers every facet of pipeline risk management, arguably the most important, definitely the most hotly debated, aspect of pipelining today.
Written by: W. Kent Muhlbauer
No. of pages: 422

Now expanded and updated, this widely accepted standard reference guides you in managing the risks involved in pipeline operations. You'll also find ways to create a resource allocation model by linking risk with cost and customize the risk assessment technique to your specific requirements. The clear step-by-step instructions and more than 50 examples make it easy. This edition has been expanded to include offshore pipelines and distribution system pipelines as well as cross-country liquid and gas transmission pipelines.
The only comprehensive manual for pipeline risk managementUpdated material on stations, geographical information systems, "absolute" versus "relative" risks, and the latest regulatory developmentsSet the standards for global pipeline risk management
Download link is below post in First comment
Don't forget to leave your comment

Thursday, November 28, 2013

Causes of Kick (Wellbore Influx)

A “Kick” or “Wellbore Influx” is undesirable flow of formation fluid into the wellbore and it happens when formation pressure is more than hydrostatic pressure in wellbore.
Deepwater Horizon offshore drilling unit on fire 2010 (Wiki)

Several causes of Kick (Wellbore Influx) are listed below:
1. Lack of knowledge and experience of personnel (Human error)– Lacking of well-trained personnel can cause well control incident because they don’t have any ideas what can cause well control problem. For example, personnel may accidentally pump lighter fluid into wellbore and if the fluid is light enough, reservoir pressure can overcome hydrostatic pressure.

2. Light density fluid in wellbore - It results in decreasing hydrostatic pressure. There are several reasons that can cause this issue such as

• Light pills, sweep, spacer in hole

• Accidental dilution of drilling fluid

• Gas cut mud

3. Abnormal pressure – If abnormally high pressure zones are over current mud weight in the well, eventually kick will occur.

4. Unable to keep the hole full all the time while drilling and tripping. If hole is not full with drilling fluid, overall hydrostatic pressure will decrease.

5. Severe lost circulation – Due to lost circulation in formation, if the well could not be kept fully filled all the time, hydrostatic pressure will be decreased.

Lost circulation usually caused when the hydrostatic pressure of drilling fluid exceeds formation pressure. There are several factors that can cause lost circulation such as

• Mud properties – mud weight is too heavy and too viscous.

• High Equivalent Circulating Density

• High surge pressure due to tripping in hole so fast

• Drilling into weak formation strength zone

6. Swabbing causes reducing wellbore hydrostatic pressure.
Swabbing is the condition that happens when anything in a hole such as drill string, logging tool, completion sting, etc is pulled and it brings out decreasing hydrostatic pressure. Anyway, swabbing can be recognized while pulling out of hole by closely monitoring hole fill in trip sheet.
Related Topics

Tuesday, November 26, 2013

Schlumberger Open Recruitment 2014 : 2 positions

85 SCHLUMBERGER RECRUITING SESSIONPosition available:
FIELD SPECIALIST for Fresh Graduates
FIELD SPECIALIST for Mid Career


Requirements for Fresh Graduate Candidates:
• D3 and D-4 Polytechnic from all ENGINEERING Degree
• Dynamic men with maximum age of 26 years old
• Very good academic result, with minimum GPA 2.70
• Excellent command of English


Requirements for Mid Career Candidates:
• Dynamic men with max 3 year working experience in Oil & Gas Services
• D3 and D-4 Polytechnic from all ENGINEERING Degree
• Excellent command of English


Application Procedure:
• Interested candidates should send CVs to INGRecruiting@slb.com with email title format:
“Degree (D3/D4)_Years of Experience (0/1/2/3 years)_FS Application”
• Maximum CV size is 5 Mb.
• Registration will be closed on 04-Dec-2013


Chosen candidates will be invited to selection test by email therefore candidates need to check their emails regularly after applying.

Related Jobs

Saturday, November 16, 2013

Texas-Drilling Rig Hits Gas Pipeline Then Explodes

November 14th, 2013 MILFORD, Texas -Hundreds of people in Ellis County were evacuated and others were asked to stay away from the area where a gas pipeline caught fire Thursday morning.
It happened at about 9:30 a.m. November 14th, 2013 near the intersection of Highway 77 and FM 308 in Milford.
Ellis County spokesman James Saulter said a Chevron crew had been conducting a type of drilling when the explosion happened.
Video from SKY4 showed heavy flames rising from what appeared to a rig in a rural field. It was surrounded by several charred work trucks. The large plum of black smoke was visible from Interstate 35E.
No one was hurt and there were no reports of damage to any nearby homes or businesses, Saulter said.
However, officials are still concerned about the fire spreading to other pipelines in the area.
The whole city of Milford, which has a population of about 800, was evacuated. Students were moved to schools in the nearby town of Italy.
Traffic on FM 308 was rerouted between Highways 22 and 77. Motorists in the area were asked to use I-35E as an alternative to Hwy. 77.
Chevron will let the pipeline burn itself out, which is expect to take about 24 hours, Saulter said.
More Photos







Related Links

Tuesday, October 8, 2013

Offshore Pioneers - Brown & Root and history of offshore oil and gas

Brown & Root, a Houston-based engineering and construction firm, built the platform from which Kerr-McGee Oil Industries drilled the first producing well beyond the sight of land in the Gulf of Mexico. The well came in on November 14, 1947, a date that marks the birth of the modem offshore oil and gas industry. Before 1947, companies had extracted oil from underwater fields, but these deposits were located primarily in protected inland waters. Oil had been produced offshore in the Gulf of Mexico before 1947, but always in sight of land. Kerr- McGee's well, in eighteen feet of water, ten and a half miles from the Louisiana shore, went a step beyond those previous developments. The Kermac 16 stood in the open waters of the Gulf, exposed to the fury of waves and wind. The success of this platform in producing oil from beyond the horizon heralded a new era of technological innovation that subsequently spread to offshore provinces throughout the world.
No. of pages: 321
Download link is below post in First comment
Don't forget to leave your comment

Drilling fluids processing handbook

Written by the Shale Shaker Committee of the American Society of Mechanical Engineers, originally of the American Association of Drilling Engineers, the authors of this book are some of the most well-respected names in the world for drilling. The first edition, Shale Shakers and Drilling Fluid Systems, was only on shale shakers, a very important piece of machinery on a drilling rig that removes drill cuttings. The original book has been much expanded to include many other aspects of drilling solids control, including chapters on drilling fluids, cut-point curves, mud cleaners, and many other pieces of equipment that were not covered in the original book.
Written by: ASME Shale Shaker Committee
No. of pages: 700
Check the Last Comment By PetroPedia to get Download Link
Don't forget to leave your comment

Share

Twitter Delicious Facebook Digg Stumbleupon Favorites More

Search This Blog

Loading

Subscribe via email

button_subscribenow.png (314×89) Learn petro engineering daily

Find Us on Facebook: