JOB & DATA Search

Here,Find what you want:

Sunday, March 31, 2013

Advances in well test analysis

This classic volume presents the design, application, and analysis of pressure-transient tests as a means of obtaining reliable information about reservoir and well conditions. It can be used for most well-test analysis situations without requiring other material. More than 50 examples are included to illustrate analysis techniques presented, as well as to emphasize practical problems that arise in well-test analysis. Includes packet of enlarged type curves to assist the engineer in actual analysis.


Written by: R.C. Earlougher Jr.

Check the last comment by PetroPedia for Working Download Link
Don't forget to leave your comment

Saturday, March 30, 2013

BG group casing design manual

This document, one of the Well Engineering and Production Operations (WEPO) technical control documents, contains the BG Group policies and standards to be adopted for well casing design. The objective is to ensure that there is a consistent approach to the safety critical aspects of casing design methodology throughout the BG Group.
Casing design is a stress analysis procedure to produce a pressure vessel, which can withstand a variety of external, internal, thermal and self weight loading. It is an integral and key part of the total well design process. The ideal casing design for any particular well, is one that is the most economic over the entire life of the well without compromising safety and the environment.


No.of pages : 51 Pages

publisher: B.G. Group

Check the Last Comment by PetroPedia for the working Download link
Don't forget to leave your comment

Sunday, March 3, 2013

Schlumberger CDs for drilling engineering


interactive show with visual and vocal effects illustrating drilling

&oil production.

the CDs is explained in 6 languages:


:: Arabic

:: English

:: French

:: Spanish

:: Indonesian

:: Portuguese


contents:

Cd1: An introduction to drilling rigs and main components of drill string

Cd2: BOP Equipments

Cd3:drilling Fluids and Mud Test

Cd4: Mud circulation and treating Equipements

Cd5: Hoisting Equipments

Cd6: Rotating Equipments & Mast and Substructure

Cd7: Pipe Handling

Cd8: Casing and Cementing

Cd9: Well logging, Mud logging and Drill stem test

Cd10: Power System and instrument


CD1

CD2


CD3


CD4


CD5


CD6


CD7


CD8


CD9


CD10


Don't forget to leave your comment
SHARE with your friends
Related Links

Share

Twitter Delicious Facebook Digg Stumbleupon Favorites More

Search This Blog

Loading

Subscribe via email

button_subscribenow.png (314×89) Learn petro engineering daily

Find Us on Facebook: